1 / 5
Fast Assembly Steel Structure Steel Color Wall Panels Prefab Galvanized Workshop
| Component | Material Type | Specification Details |
|---|---|---|
| Steel Frame | H section steel | Q235/Q355 steel 8mm/10mm |
| Welding | Automatic submerged arc welding | |
| Surface finish | Alkyd paint or galvanized | |
| Supporting System | Braces | Angle brace, Horizontal brace, Column brace |
| Tie rod | Φ89*3, Steel Q235, painted | |
| Bolts | M20 (Grade 10.9) and M12 Galvanized | |
| Roof & Walls | Panels | Sandwich panel or corrugated steel sheet |
| Purlin | C160*60*2.5, Steel Q235 |
Designed with 3D models for salt & chemical industrial projects. Fabricated approximately 600 tons of steel components including specialized indoor painting for thick coating requirements.
Spanning 39,700 square meters, this heavy steel warehouse utilized 3,000 tons of prefabricated steel to significantly shorten the construction period.


All components, panels, and bolts are packed for ocean transportation and loaded into 40'HQ containers. Skilled workers use cranes and forklifts to ensure goods remain undamaged during loading.


Please provide the following details for an accurate price estimate:
| Requirement | Details Needed |
|---|---|
| Location | Country and area of construction |
| Size | Length * Width * Height (mm) |
| Loads | Max wind speed (m/s) and Max snow height (mm) |
| Insulation | EPS, Fiberglass, Rockwool, or PU panels |
| Crane | Lifting weight (tons) and height (m) |