Prefab Steel Structure Workshop Building Steel Structure Processing Plant

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information

Model NO.
DRYC64-C
Service
Design, Production, Installation
Life Span
>50 Years
Surface Treatment
Painting or Hot DIP Galvanized
Type
Heavy Section Steel
Standard
GB, ASTM, DIN, JIS, AISI, BS
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Application
Steel Workshop, Platform, Fabricated House, Roofing, Bridge
Warranty
1 Year
Carbon Steel
Q235/Q355b
Production Capacity
26,000 Tons a Year

Product Description

Steel Structure Workshop

KEY ADVANTAGES

🏗️
Free Design: Professional architectural drawings provided at no cost.
🛡️
Durability: Designed for a life span of over 50 years with easy maintenance.
Fast Assembly: Quick installation with comprehensive online guidance.
🌪️
High Resistance: Strong performance against high winds and seismic activity.
🔇
Insulation: Superior thermal, noise, water, and fire protection.

TECHNICAL SPECIFICATIONS

Component Material / Specification
Main Frame Column & Beam Q345 or Q235 Welded H Steel
Tie Bar Steel Tube
Bracing Round Steel / Angle Steel
Purlin Galvanized C/Z Type
Cladding System Roof & Wall Panel Color Steel Sheet / Sandwich Panel
Doors Sandwich Sliding / Rolling Shutter
Windows Aluminum / PVC
Foundation Anchor Bolts M24 / M27 / M30
Strength Bolts 10.9S High Strength

DESIGN DISPLAY

Design 1
Design 2
Design 3
Design 4

MATERIAL & EQUIPMENT

Material 1
Material 2
Our facility integrates design, manufacture, and installation with a monthly processing capacity of 2,500 tons. Utilizing 6 advanced H-beam production lines, we ensure high-precision automation throughout the welding and straightening processes.
Equipment 1
Equipment 2
Equipment 3
Equipment 4
Equipment 5
Equipment 6

Global Project Cases

Project Case 1

Industrial project with 28,103 sqm area, utilizing 2,016 tons of engineering steel.

Project Case 2

Multi-story workshop with 6 floors, reaching a building height of 39.15 meters.

Project Case 3

Advanced Research Institute platform using 3,485 tons of structural steel.

Project Case 4

Industrial Park development with a construction period of 180 days.

Frequently Asked Questions

Q1: What are the primary benefits of steel construction?
Steel structures are highly durable with a long lifespan, feature short construction periods, are cost-effective, reusable, and offer excellent seismic performance due to high strength-to-weight ratios.
Q2: How can I obtain a project quotation?
If you have existing drawings, we provide quotes based on them. If you don't have a design, our engineers will create one for your confirmation before providing a detailed quote.
Q3: Do you provide material samples?
Yes, we offer material samples free of charge; however, the cost of transportation is typically covered by the client.
Q4: What are your accepted payment terms?
We accept multiple payment methods including L/C, T/T, and Western Union for project transactions.
Q5: How is quality control managed during production?
We employ a professional quality control team with extensive experience using advanced inspection equipment to ensure every component meets international standards.
Q6: Can you assist with the installation process?
We provide detailed instructional photos and videos. When necessary, we can dispatch professional engineers for on-site construction guidance and skilled workers for installation support.
Professional quality and integrity for the future. Contact us for your next project.

Related Products