1 / 5
PREFABRICATED STEEL STRUCTURE FRAME PLANT BUILDING:
Preservative Treatment Options:
1. Painted: SA2.5 Grade cleaning, 2 layer epoxy zinc-rich primer + 2 layer antirust paint (Total: 100-120um). Warranty: 18-20 years.
2. Hot-dipped Galvanized: Thickness ranging from 65um to 86um depending on component size. Warranty: 45-50 years.
| Size | Length * Width * Height, Ridge height, Slope |
| Standard | GB |
| Usage | Steel warehouse, workshop, steel structure plant etc. |
| Design Load | Wind speed, Snow load, Earthquake |
| Wall and Roof | Panel or Steel sheet |
| Insulation | Sandwich panel (EPS, Glass wool, Rock wool, PU) |
| Surface | Hot dip galvanize or Painted |
| Accessories | Down pipe, Out gutter, Ventilator, Skylight etc. |