Prefabricated Steel Structure Warehouse Storage Warehousing Facilities

Customization: Available
MOQ: 300sq.M
Size: According to The Need of Design

Product Description

Basic Specifications

Model NO.
KXD-SSB32
Color Reference
Ral
Engineering Team
20 Members
Quality Inspection
Daily
Life Cycle
80 Years
Construction Period
60 Days
Material
Steel Structure
Usage
Warehouse
Certification
ISO / SGS / BV
Warranty
30 Year Limited Warranty
Production Capacity
2000 ton / Month
Origin
China

Product Description

What is pre-engineered steel building?

Pre-engineered steel buildings are steel structures built over a structural concept of primary members, secondary members, roof and wall sheeting connected to each other and various other building components.

These buildings can be provided with different structural and non-structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors & windows, trusses, mezzanine floors, fascias, canopies, crane systems, insulation etc., based on the customer's requirements. All the steel buildings are custom designed to be lighter in weight and high in strength.

Model of pre-engineered steel buildings

Applications of pre-engineered steel buildings

Pre-Engineered Buildings are the most flexible solutions for contractors and owners. With the advantages of low cost, high durability, perfect quality control and fast erection; PEBs are used for various applications:

  • Industrial: Factories, Workshop, Warehouses, Cold Storages, Steel Mills, Assembly Plant
  • Commercial: Showrooms, Supermarkets, Offices, Shopping Centers, Exhibition Halls, Restaurants, Logistic Centers
  • Public: Schools, Hospitals, Conference Halls, Laboratories, Museums, Stadiums
  • Others: Farms, Utility Shelters, Pump Stations, Aircraft Hangars, Airport Terminals
Industrial Steel Structure
Commercial Steel Structure

Why choose pre-engineered steel buildings?

1. Cost Savings
Price per square meter can be 25%-30% lower than conventional buildings.
2. Quick Erection
60% less construction time required compared with traditional concrete buildings.
3. Flexibility
Easy to expand in the future and economically low transportation costs.
4. Energy Efficiency
Green solution with CO2 reduction and high recyclability.

Components of Pre-engineered Steel Building

PRIMARY MEMBERS / MAIN FRAMES

Primary members are the main load carrying and support members. These include columns, rafters and other supporting members. The shape and size vary based on application.

Primary Members

SECONDARY MEMBERS & PANELS

Secondary Framing: Includes purlins, girts, eave struts, wind bracing, and base angles. Minimum yield strength of 345 MPa (50,000 psi).

Roof & Wall Sheets: Standard thickness 0.3mm to 0.6mm. Hot dipped and galvanized with zinc or zinc-aluminium coating for corrosion resistance.

Accessories: Anchor bolts, fasteners, gutters, downspouts, doors, windows, and skylight panels.

Manufacturing & Quality Control

Material Preparation & Fit-up

All steel components are processed through automated machines. NC files are used for precise punching, drilling, and plasma cutting. Fit-up involves connecting end plates, stiffeners, and purlin cleats by tack welding before final inspection.

Fit-up process
Welding Process

Blasting & Painting

Substrates are cleaned to Grade SA 2.5 standard. Painting is applied via Airless spray. Standard thickness is 150μm for indoor and 125μm for outdoor members, ensuring long-term protection against the environment.

Blasting Process
Painting System

Welding Standards

Form of Fillet Weld K (Size Value) Application Note
Without groove K=(0.7~1)t and ≤15mm Standard steel structure buildings
Without groove K=(0.5~0.6)t Strengthening ribs & secondary members
With groove (CJP/PJP) K=t/4 and ≤10mm Standard steel structure buildings
With groove (CJP/PJP) K=t/2 and ≤10mm Crane beams or important connections
Weld Illustration
Weld Illustration 3

Frequently Asked Questions

What are the primary benefits of using a pre-engineered steel building?
The main benefits include significant cost savings (25%-30% lower than traditional methods), rapid construction (60% faster), high structural strength, and extreme flexibility for future expansion.
How long is the life cycle and warranty for these steel structures?
Our steel structures are designed with a life cycle of up to 80 years. We offer a 30-year limited warranty, ensuring long-term durability and reliability for your project.
Can the design of the warehouse be customized?
Yes, all buildings are 100% customized. We can incorporate mezzanine floors, crane systems, specialized insulation, and various door/window configurations to meet specific operational requirements.
What quality standards do you follow during manufacturing?
We strictly follow international standards including ISO9001 and CE. Fabrication follows GB/T specific protocols for welding, blasting (Grade SA 2.5), and multi-layer painting systems.
What is the typical construction timeline?
For a standard project like the KXD-SSB32, the construction period is approximately 60 days, thanks to the prefabricated nature of the components which are simply bolted together on-site.
Are these steel buildings environmentally friendly?
Yes, pre-engineered buildings are a "green" solution. Steel is highly recyclable, and the construction process results in lower CO2 emissions and better energy efficiency compared to concrete.

Related Products